Defined service formats for civil engineering teams handling logistics warehouse projects, from initial site assessment to final blueprint approval.
A structured set of engineering programs covering the full delivery chain: site assessment, structural blueprinting, and construction-phase technical supervision. Each program is scoped around a specific stage of warehouse development, so the right team can step in at the right moment.
Soil analysis, topographical mapping, and load-bearing capacity checks that determine foundation requirements before any structural planning begins. The output is a technical site report that anchors every later decision.
Detailed CAD drawings for steel frames, concrete pillars, and roof trusses, with load calculations and material specifications. Blueprints are reviewed against Malaysian building codes and handed over in a format ready for tender.
On-site inspection of concrete pours, steel installation, and alignment checks during the construction phase. The program includes weekly progress reports and a final structural sign-off before handover.
Column spacing, clear height, and floor flatness planning tailored to racking systems and forklift traffic. The focus is on usable storage volume and unobstructed movement paths, not generic building dimensions.
Pile and raft foundation designs based on actual soil conditions and warehouse load profiles. Each design includes settlement calculations and reinforcement schedules for the contractor.
Preparation of structural calculation reports, authority submission documents, and as-built drawings. This program keeps the project aligned with local regulatory requirements from first sketch to final approval.
Review the starter service kitProgram formats for logistics warehouse engineering
Three structured formats that cover the full arc of a warehouse build, from the first site survey to the final load calculations. Each package is a defined scope of work with clear deliverables, not a vague service promise.
Full technical drawings for the load-bearing frame, foundation layout, and column spacing. Includes steel reinforcement schedules, connection details, and a material takeoff list. Suited for projects where the architectural shell is already defined and the engineering layer needs to be locked down before tendering.
Review the blueprint scopeSoil analysis, topographical mapping, and bearing capacity assessment for the proposed pad. The deliverable is a foundation plan with pile or raft recommendations, drainage gradients, and settlement limits. This package is the first step when the land parcel is selected but the ground conditions are unverified.
See the survey workflowAn independent check of existing structural documents, load paths, and compliance with Malaysian building codes. Produces a marked-up drawing set, a risk register, and a revision list. Useful for developers who inherited plans from another firm and need a second opinion before committing to construction.
Request a plan reviewOn-call engineering oversight during the build phase. Covers site visits, response to RFIs, verification of as-built conditions, and sign-off on critical structural connections. The retainer is structured around a fixed number of site days per month, with additional visits billed separately.
Discuss a retainer term