For managers overseeing warehouse builds, the gap between a blueprint and a finished slab is where delays appear. We provide the technical documentation and load calculations that keep your schedule on track.
Feedback from logistics facility leads who rely on our blueprints for load-bearing frameworks, foundation planning, and site coordination across Johor and the wider region.
We handed over a 42,000 sqm distribution hub to Dominiqueribes for structural detailing. The drawing set arrived with load calculations, column schedules, and reinforcement notes fully cross-checked. Our site team did not have to chase clarifications.
Hector Flores Romero, Senior Project ManagerFor a cold storage facility near Pasir Gudang, the team adjusted pile depths after reviewing the borehole data. That decision saved us from rework during the wet season. The structural plan stayed realistic and buildable.
Juan Ortega Reyes, Construction LeadThe interface drawings for the mezzanine and roof trusses were consistent with the precast supplier's shop drawings. Fewer RFIs meant the erection sequence stayed on schedule. That is rare in this market.
Site Engineer, Logistics Park DevelopmentDominique Ribes walked our estimating team through the alternative foundation scheme and explained where the savings came from. No vague promises, just section properties and construction sequence notes.
Procurement Manager, Industrial Contractor